New Front Entrance

New Front Entrance

Construction of a new teaching block to provide additional teaching accommodation for an existing secondary school. The single storey steel framed construction provides two general classrooms, an ICT Suite, offices and sanitary accommodation.

Scope of Works

  • Provide professional services for new build project

Scope of Service Provided

  • Acted as CDM Co-ordinator
  • Completion of Feasibility Study
  • Obtaining of Planning & Building Regulation Approval
  • SBEM Energy calculation
  • Production of Detailed Design
  • Preparation of Specification
  • Management of Tendering Process
  • Contract Administration
  • Acted as Client Quantity Surveyor
  • Applied for funding on clients behalf & managed financial spend of full project
  • Management of all furniture, furnishings & ICT equipment orders

Contract Value: circa £500k

Rear Elevation

Rear Elevation

Contract Period: 27 weeks

CSN were approached by Mrs Sylvia Walters, the Project Co-ordinator of St Patrick’s Hall Management Committee in late 2006 to produce a Feasibility Study for the final phase of redevelopment of the Church Hall which included providing a new IT Learning and Language Suite, a new Music Practice Suite, improved space for the thriving existing Youth Club along with the provision of extended and refurbished toilet facilities, a wheelchair platform lift and a new entrance lobby.

This Feasibility Study enabled the Hall Management Committee to be successful in the first stage of an application for funding from the Big Lottery Fund and they were subsequently awarded a Development Grant to progress the application further. (See link)

St Patrick's Hall

St Patrick's Hall

CSN then produced a Capital Project Delivery Plan as required by the Big Lottery Fund which in conjunction with a Business Plan prepared by the Hall Management Committee was successful ahead of over 1000 similar applications in obtaining just under £100,000 worth of funding from the Big Lottery Fund from a pot of funding available under the Community Buildings programme.The Big Lottery Fund subsequently gave praise for quality of the submission from the Hall Management Committee and in particular the exceptional quality of the Capital Project Delivery Plan prepared by Mark Mulhern of our Washington Office and this quality was key to the success of the funding application as it demonstrated the strong need for the redevelopment and the professional and structured manner which the proposed project would be executed through to completion.

CSN are delighted to have been of assistance to the Hall Management Committee and look forward to continuing our successful working relationship with the Committee even further to deliver the project.

Since funding was obtained, CSN have subsequently obtained Planning Permission for the striking new Entrance Lobby and are now underway with preparing the full design package for the alteration and refurbishment project.

Details

  • Private Client
  • Provision of New Garage Block to Listed Building
  • Contract Value £75,000

Scope of Services Provided

  • Complete design and Contract Administration of New Garage Construction to a grade 2 listed building.
  • Repair and Maintenance of external fabric to hall

Images

To follow…

Partial new build and amendment of existing building to provide additional changing facilities.

Main aim of project was to provide an extension which complimented the main building as well as providing the changing facilities. Work consisted of underpinning existing foundations to take the additional load, new cavity wall construction with a complicated truss rafter roof.

Scope of Works

Cochrane Park Sports Pavilion

Cochrane Park Sports Pavilion

  • New build
  • Refurbishment

Scope of Services Provided

  • Site Survey
  • Feasibility Study
  • Design, M & E co-ordination
  • Planning & Building Regulation Application
  • Preparation of Specification
  • Tendering process
  • Project Monitoring and Supervision
  • Final Account negotiations
  • Planning Supervision
  • Co-Ordination of other Consultants
New Extension

New Extension

Clients Comments

Contract Value £82,500

Contract Period Twelve Weeks

“Impressive and tasteful extension which has provided much needed extra changing facilities. The external decoration and lines of the extension blend in perfectly with the existing building which is full of character and a valuable asset to the University.”

Office after refurbishment

Office after refurbishment

We were approached by a commercial client to refurbish two newly acquired offices. These included the head office in Gosforth and another office in Gateshead.

CSN provided pre-acquisition advice; a fully detailed surveyed to allow the preparation of a specification and detailed AutoCAD drawings to allow competitive tenders to be sourced. Full Contract Administration was provided to monitor works on site from inception to completion to ensure all works were undertaken correctly in full accordance with the Construction (Design and Management) Regulations as well as obtain Building Control and Planning permissions.

Scope of Work

  • Refurbishment
  • Re-roofing
  • External remedial works and cladding replacement
  • Full internal refurbishment inclusive of Open Plan Offices, Kitchen and WC facilities on two floors

Scope of Services Provided

Meeting Room

Meeting Room

  • Site Survey
  • Feasibility Study
  • Planning & Building Regulation Application
  • Preparation of Specification
  • Tendering process
  • Project Monitoring and Supervision
  • Final Account negotiations
  • Planning Supervision

Contract value – £214,000.00

Scope of Works

Before demolition

Before demolition

  • Demolition

Scope of Services Provided

  • Site Survey
  • Feasibility Study
  • Planning & Building Regulation Approval
  • Preparation of Specification
  • Tendering process
  • Project Monitoring and Supervision
  • Final Account negotiations
  • Planning Supervision

Contract Value £33,500.00

Contract Period Eight Weeks

During demolition

During demolition

New Mezannine level IT suite

New Mezzanine level IT suite

Conversion of former Reception Hall and IT Suite. Main aim of project was to provide increased IT suite and Business Centre. Work consisted of splitting the Hall into Four purpose designed rooms for Conference and IT facilities as well as individual study suite and Classroom.

Scope of Works

  • Refurbishment of Hall

Scope of Services Provided

  • Site Survey
  • Feasibility Study
  • Planning & Building Regulation Application
  • Preparation of Specification
  • Tendering process
  • Project Monitoring and Supervision
  • Final Account negotiations
  • Planning Supervision
New meeting & lecture room

New meeting & lecture room

Contract Value £130,000.00

Contract Period Ten Weeks

Clients Comments

“Impressive, very pleased with facilities provided which will add to the schools Business Centre and Community links through Business in the Community programme.”

Erosion of carved stone detail

Erosion of carved stone detail

Phased Planned Maintenance inspections as part of Condition Survey of University Stock highlighted defects in a Grade II listed property. A Schedule of works was compiled, tendered and tender analysis reported to client.  Work was carried out in stages to a program driven by priority of repair and minimum inconvenience to end users.

Scope of Works

  • Stonework repairs
  • Stone Cleaning
  • Re-pointing
  • Decoration works
  • Brickwork repairs

Scope of Service Provided

Repaired stone balustrade

Repaired stone balustrade

  • Site Survey
  • Maintenance Plan
  • Design
  • Preparation of Specification
  • Tendering
  • Client Liaison
  • Contract Administration
  • Project Supervision
  • Agree Final Account
  • Planning Supervision
  • Consultants Co-ordination

Contract Value £650,000

Contract Period Varied as completed in phases

Refurbishment of Hall of Residence

Details

The works were required to five blocks of flats containing 10 two person and 30 single person flats. The brief included complete refurbishment of the common areas (kitchen, shower, WC, lounge and corridor) to form part of a rolling refurbishment programme. The works consisted of upgrading the kitchen and shower facilities to provide a maintenance free environment. This was achieved, in part, with the provision Altro Whiterock to all wall and ceiling surfaces within the kitchens and self-contained pods incorporating a WC, WHB and Shower for the two person flats and single shower pods elsewhere. This project is currently on site and is anticipated to be completed on programme and within budget.

Scope of Services Provided

  • Measured Survey
  • Preparation of Specification and Drawings
  • Tendering and Budget Cost Advice
  • Project Monitoring, Supervision and Contract Administration
  • Final Account negotiations
  • Planning Supervision

Images

To follow…

Conversion of semi derelict farm buildings into accessible domestic residence.

Main Entrance

Main Entrance

Details

We were approached by a private client who was wishing to convert dilapidated farm buildings to a high specification domestic residence, with particular care paid to accessibility due to limited mobility.

CSN designed a conversion scheme with level access throughout giving superb quality living accommodation whilst respecting the beautiful setting of the property, set in a rural conservation area.  We included an indoor pool into the development, with the addition of a counter current system could be used by the client for physiotherapy.

Scope of Services Provided

  • Establishing clients requirements at inception
  • Structural survey & feasibility study
  • Initial concept design
  • Planning application
  • Full scheme design and tendering
  • Project monitoring
  • Final account preparation

Images

The Pool

The Pool